North Marine is engaged to project manage the removal, towage and re-installation of marine infrastructure for GBR Helicopters – from the Port of Cairns ‘pier’ location – to undergo a refit.
GBR Helicopters forms part of the Morris Aviation Group, which collectively forms the largest helicopter fleet in Northern Australia.
Scope of Work
North Marine project managed the complete removal, towage and re-installation of helipad infrastructure from the Port of Cairns ‘Pier’ location, for GBR Helicopters. The project encompassed two 16-meter by 8-meter helipad pontoons, support brackets, struts, gangways, etc.
After dismantling the marine plant & equipment, it was then transported by North Marine workboats ‘Viking’, ‘Gulf Explorer’ and ‘Drogue’, as well as by road, to the Norship slipway for refit.
Following refurbishment, the helicopter infrastructure was reinstalled in its original location at the Cairns Pier.
All works were conducted without interfering with vessel traffic in the area.
Considerations
Managing this marine infrastructure project presented numerous logistical challenges. Detailed planning and methodology covered: